Project management with PMI and PMBOK – a proven standard in transition

PMI's PMBOK Guide is considered one of the most important standards in project management and has fundamentally evolved with the seventh edition. While earlier versions followed a process-oriented approach, PMI is now increasingly focusing on flexible principles and result-oriented service domains. This change makes it possible for companies to use PMBOK not only for traditional projects but also for agile and hybrid projects. But how can PMBOK be optimally implemented in practice? This article provides an in-depth look at the twelve principles, eight performance domains and the most important certifications. We also show you how to work in a PMBOK-compliant manner with Projektron BCS – from planning and risk assessment to reporting.

What are PMI and the PMBOK Guide?

The Project Management Institute (PMI) was founded in the United States in 1969 to establish project management as an independent discipline and to professionalize it. At a time when structured project management methods had not yet been standardized in many industries, PMI recognized the need for a common understanding of best practices.

The founding idea was based on the following objectives:

Promoting a unified approach to project management

Providing training and certification

Developing an international network for the exchange of knowledge

Milestones in PMI's history

Year

Event

1969

PMI founded in Pennsylvania, USA

1984 

First version of the PMBOK Guide published

1991 

Introduction of the Project Management Professional (PMP) certification

1996

Official recognition of PMBOK as a standard by the American National Standards Institute (ANSI)

2017

Integration of agile methods into the PMBOK Guide (6th edition)

2021

Publication of the 7th edition with a stronger focus on principles instead of rigid processes

With over 700,000 members and more than one million certified professionals worldwide, PMI is now the leading organization in the field of project management.

The development of the PMBOK Guide – from its beginnings to the current edition

The PMBOK Guide (Project Management Body of Knowledge) is PMI's most important reference work. It defines methods, processes and best practices that are considered the standard for professional project management.

In the 1980s, PMI collected proven methods from practice to create a uniform project management methodology. This resulted in the first version of the PMBOK Guide in 1984, which served as a guide for professional project managers.

Edition

Year of Release

Key Innovations

1st Edition

1987

First standardized definition of processes in project management

2nd Edition

1996

Introduction of the five process groups and nine knowledge areas

3rd Edition

2004

Expansion to include stakeholder and risk management

4th Edition

2009

Simplification and better structuring of processes

5th Edition

2013

Introduction of the knowledge area “stakeholder management”

6th Edition

2017

Integration of agile methods

7th Edition

2021

Transition from process orientation to principle orientation

Current alignment of the PMBOK Guide: from process to principles

The 7th edition of the PMBOK Guide breaks with previous versions by focusing less on rigid processes and more on twelve universal principles and eight performance domains. This is intended to allow for greater flexibility and adaptability for different industries.

Project management has evolved considerably, particularly with the advent of agile and hybrid approaches. The new structure is less focused on strict processes and is designed to offer more flexibility for different types of projects. This allows project managers to tailor methods to their specific requirements.

Why is PMBOK one of the most important standards in project management?

PMBOK has established itself as the global standard because it:

Can be applied across industries: Whether construction, IT or healthcare – the principles apply universally.

Summarizes best practices: The guide is based on the experiences of thousands of project managers.

Creates a common language: Terms and methods are internationally recognized and facilitate communication in teams.

The basis for certification: The PMI certifications, which are in demand worldwide, are based on the PMBOK Guide.

Hybrid methods are supported: Since the 6th edition, agile and classic approaches can be combined.

What is the PMBOK Guide used for?

Project management is a complex discipline influenced by numerous factors: time, costs, resources, risks and much more. The PMBOK Guide (Project Management Body of Knowledge) was developed to ensure a structured approach. It is a kind of “toolbox” for project managers and offers a proven methodology for the successful implementation of projects. PMBOK is used in almost every industry, including:

  1. IT and software development – structured planning of complex IT projects
  2. Construction and engineering – project management for large-scale projects
  3. Healthcare – clinical trial management and digitalization
  4. Automotive and manufacturing – process optimization and product development
  5. Finance – risk management in banks and insurance companies

PMBOK's universal applicability enables a structured approach to projects regardless of size, industry, or complexity. But how exactly is this guide structured?

Overview of the ten knowledge areas (up to edition 6)

Until the sixth edition, the PMBOK Guide divided project management into ten knowledge areas. Each of these areas covered a specific aspect essential to the success of a project. They were intended to help divide the complexity of project management into clearly defined topics.

Knowledge Area

Included aspects 


1. Integration Management
 

The core of project management. This is where all processes and activities are coordinated to ensure that the project works as a whole. From the start of the project to its completion, this area of knowledge ensures that all components are smoothly interlinked.
 

2. Scope Management
 

Where does the project begin and where does it end? Defining and controlling the project scope ensures that new requirements are not constantly being added and the project gets out of hand (keyword: “scope creep”).
 

3. Schedule Management
 

No successful project without a schedule. Planning, managing and controlling the project time ensures that milestones are met.
 

4. Cost Management
 

A good budget is the basis for every project. Estimates, calculations and ongoing cost control help to avoid unpleasant surprises.
 

5. Quality Management
 

What use is a project that is completed on time if the result is not convincing? This field of knowledge ensures that project performance meets expectations.
 

6. Resource Management
 

People, machines, material – this field of knowledge ensures that all the required resources are in the right place at the right time.
 

7. Communications Management
 

Clear communication is crucial. Who needs to receive what information and when? A communication management plan prevents misunderstandings and information gaps.
 

8. Risk Management
 

There are risks in every project. The trick is to recognize them early, evaluate them and take steps to minimize them.
 

9. Procurement Management
 

External service providers or materials often have to be procured. Contracts and supplier management fall within this area.
 

10. Stakeholder Management
 

Every project involves various stakeholders. Managing their expectations and gaining their support is a key success factor.
 

With the seventh edition of the PMBOK Guide, the ten knowledge areas from previous versions were officially supplemented by a principle-based approach, or rather, this approach was introduced to replace the previous structure. This means that instead of detailed processes and knowledge areas, the focus is now on the twelve universal principles and eight so-called performance domains.

Knowledge areas remain relevant

The knowledge areas were not completely discarded, but are included in the new performance domains and in the PMBOK Guide – Seventh Edition in a more flexible form. Organizations can continue to work with the knowledge areas, especially if they prefer a process-based structure. The sixth edition of the PMBOK Guide remains a relevant reference for traditional project management methodologies.

The 8 performance domains according to PMBOK (since Edition 7)

In the seventh edition of the PMBOK Guide, eight performance domains play an important role alongside the ten knowledge areas. These form a holistic framework for project management and are not to be understood as isolated areas, but rather work dynamically together.

Performance Domain

Included Performances


1. Stakeholder
 
  • Actively engage stakeholders and manage their expectations
  • Develop communication strategies
  • Foster trust and collaboration

2. Planning
 
  • Determine the project life cycle (linear, iterative or hybrid)
  • Define project goals, milestones and dependencies
  • Dynamically adjust planning when conditions change

3. Navigating Uncertainty and Ambiguity
 
  • Actively managing dynamic conditions and risks
  • Strengthening adaptability and resilience
  • Developing strategies to reduce uncertainty

4. Team
 
  • Build and motivate high-performance teams
  • Enable collaboration and self-organization
  • Define clear roles and responsibilities

5. Measurement
 
  • Define success criteria based on KPIs and metrics
  • Regularly assess and communicate progress
  • Enable data-driven decisions

6. Delivery
 
  • Focus on business benefits and added value for customers
  • Clear definition of success criteria
  • Ongoing evaluation of whether the project is delivering the desired results

7. Development Apporach and Life Cycle
 
  • Establish governance structures
  • Define decision-making processes and escalation paths
  • Ensure adherence to standards and compliance

8. Project Work
 
  • Provide efficient processes and methods for implementation
  • Continuously monitor and adjust results
  • Ensure quality and delivery capability

The five process groups according to PMBOK and their significance

In addition to the knowledge areas, the PMBOK Guide divides the project process into five process groups based on the Deming Cycle. They describe the phases that every project – regardless of industry or size – goes through.

Process Group

Included Tasks


1. Conception & Initiation
 

Every project begins with an idea. In this phase, the project mandate and rough objectives are defined. Who are the stakeholders? What should the project achieve?
 

2. Definition & Planning
 

The detailed planning begins. Timelines, cost calculations, risk assessments – everything is defined as precisely as possible in advance to avoid problems later on.
 

3. Launch or Execution
 

Now it's time to get to work. The project team implements the plan, completes tasks and advances the project step by step.
 

4. Performance & Control
 

Is everything going according to plan? If not, adjustments need to be made. Progress, costs and risks are constantly monitored here.
 

5. Closure
 

After successful implementation, the project is officially closed. A final evaluation ensures that experiences are documented for future projects.
 

Loss of importance of the process groups with PMBOK 7th Edition

In the 7th edition of the PMBOK Guide, the traditional process groups have not been completely replaced, but their role has been changed and they are no longer emphasized in the same structural way as in previous editions. The 7th edition focuses on the 8 performance domains and 12 principles of project management, rather than categorizing project management processes into familiar process groups.

The process groups are still relevant in the 7th edition, but the focus is more on the results and values of the project. Instead of a detailed process structure, the emphasis is now on a more flexible, agile approach that is geared to the specific needs of a project rather than to rigid, predefined phases.

The 47 processes according to PMBOK

The PMBOK Guide (up to the 6th edition) structured project management based on the five process groups and ten knowledge areas. These were linked by a total of 47 processes. This structure formed a kind of matrix in which each process was assigned to a specific process group and, at the same time, to a knowledge area. The five groups represent the chronological sequence of a project, while the ten knowledge areas represent the various specialist areas in project management. Each of the 47 processes was assigned to a process group and a knowledge area. For example, the process “Identify Risks” belongs to the process group “Planning” and the knowledge area “Risk Management”.

The overview of the assignment of processes to process groups shows that the PMBOK clearly emphasizes the process group “Planning”.

 

Initiation

Planning

Execution 

Control

Closure 


Integration Management
 


Develop Project Charter


Develop Project Management Plan


Direct and Manage Project Knowledge


Monitor and Control Project Work


Close Project or Phase


Manage Project Knowledge


Perform Integrated Change Control


Scope Management
 

 


Plan Scope Management

 


Validate Scope

 


Collect Requirements


Define Scope


Control Scope


Crate Work Breakdown Structure


Schedule Management
 

 


Plan Schedule Management

 


Control Schedule

 


Define Activities


Sequence Activities


Estimate Sctivity Durations


Develop Schedule


Cost Management
 

 


Plan Cost Management

 


Control Cost

 


Estimate Costs


Determine Budget


Quality Management
 

 


Plan Quality Management


Manage Quality


Control Quality

 

Resource Management
 

 


Plan Ressource Managment


Acquire Resources


Control Resources

 


Develop Team


Estimate Activity Resources


Manage Team


Communications Management
 

 


Plan Communications Management


Manage Communications


Monitor Communications

 

Stakeholder Management
 


Identify Stakeholders


Plan Stakeholder Engagement


Manage Stakeholder Engagement


Monitor Stakeholder Engagement

 

Risk Management
 

 


Plan Risk Management


Implement Risk Responses


Monitor Risks

 


Identify Risks


Perform Quantitative Risk Analysis


Perform Quantiative Risk Analysis


Plan Risk Responses


Procurement Management
 

 


Plan Procurement Management


Conduct Procurements


Control Procurements

 

The following was defined for each process:

input variables (inputs, e.g. project objectives, requirements)

methods and tools (e.g. risk analysis, Gantt charts)

output values (outputs, e.g. risk register, reports)

The 12 principles according to PMBOK (since edition 7)

The twelve universal principles of project management were introduced with the seventh edition of the PMBOK Guide (2021). They replace the previous process-based structure with a more principle-oriented approach to allow more flexibility for different project environments. These principles apply to all projects, regardless of industry, size or methodology. They are aligned with the Code of Ethics of the PMI and define the what and why of project management.

Principle

Meaning


1. Stewardship
 

Take responsibility for the project and its impact, make sustainable decisions and act ethically.
 

2. Team
 

Build an effective team, promote collaboration and create a positive work culture.
 

3. Stakeholders
 

Identify relevant stakeholders at an early stage, actively involve them and manage their expectations.
 

4. Value
 

Manage projects in a way that continuously generates value for customers and organizations.
 

5. System thinking, holistic approach
 

Understand projects as part of a larger environment and take systemic interactions into account.
 

6. Leadership
 

Enable leadership at all levels, delegate responsibility and encourage team members to take initiative.
 

7. Tailoring
 

Adapt approaches and tools to the specific project and its requirements.
 

8. Quality
 

Continuously review and improve processes and results to achieve the desired standards.
 

9. Complexity
 

Actively manage uncertainties and dynamic changes and flexibly adapt solutions.
 

10. Risk
 

Systematically identify and evaluate risks and develop strategies to take advantage of opportunities and minimize threats.
 

11. Adaptability and Resilience
 

Design projects so that they can respond to changes without losing sight of the overall goal.
 

12. Change Management
 

Document and share knowledge and experiences and make them available for future projects.
 

These principles provide a flexible framework for modern project management that integrates both traditional and agile methods. They help project organizations to manage their projects efficiently and achieve successful results in the long term. It is no coincidence that there are 12 principles:

Both the Agile Manifesto with its 12 principles and the PMBOK Guide (7th edition) with its 12 universal principles are based on fundamental values that can be applied independently of specific methods or frameworks. This could indicate that PMI deliberately wanted to build a bridge between traditional and agile project management with the seventh edition.

While earlier versions were strongly focused on processes and best practices, PMI is now emphasizing universal principles that can be applied in different environments and methods (classic, agile, hybrid). This development fits with the general direction in project management: away from rigid processes and toward adaptive principles that meet the specific requirements of a project or company. The integration of agility into the PMBOK Guide also suggests that PMI has recognized the change in practice – companies are less and less likely to work only in a classic or only in an agile way, but use hybrid approaches.

Agile and hybrid methods in the current PMBOK Guide

In the current version of the PMBOK Guide, agile and hybrid methods play a major role. While traditional project management approaches rely heavily on planning and control, agile methods offer more flexibility. This is particularly advantageous for software projects or other dynamic environments.

Agile project management: Here, projects are developed iteratively. Instead of creating a fixed plan for the entire project, there are short development cycles (sprints) in which feedback is continuously gathered.

Hybrid methods: A mixture of classic and agile project management. Structured planning combined with flexible adjustments ensures the best of both worlds.

Lean approaches: processes are reduced to the essentials to maximize efficiency and speed.

These methods help to better meet modern project challenges and to react more quickly to changes.

How is a project carried out according to PMBOK?

The PMBOK Guide is not just a theoretical model – it also provides a clear structure for practical application. According to PMBOK, a project typically runs in several phases, even though the seventh edition is de-emphasizing this approach.

1. Initiation: From the project charter to the stakeholder analysis

The foundation for the entire project is laid in the initiation phase. The aim here is to define the project idea, evaluate the benefits and define the initial framework conditions. The central component of this phase is the project charter, which includes all relevant key data, objectives and stakeholders.

Important steps in this phase:

Formulate project charter: The project charter is the central document that describes the purpose of the project, the rough planning and the resources.

Conduct a stakeholder analysis: Who has an interest in the project? What are the expectations of the parties involved? These questions are answered in a detailed stakeholder analysis.

Conduct a cost-effectiveness review: Does the project make financial and strategic sense? It may be necessary to conduct feasibility studies or cost-benefit analyses at this stage.

A well-structured start reduces the risk of misunderstandings and creates a solid basis for the next phase: detailed planning.

2. Planning: managing time, costs, risks and quality

Initiation is followed by the extensive planning phase. This is where the necessary measures are defined to achieve the project goal. This phase is particularly important because it lays the foundation for the subsequent implementation.

Important aspects of the planning phase:

Time management: creating a realistic project schedule with milestones.

Cost management: calculating the budget and defining the cost structure.

Risk management: identifying, analyzing and assessing possible risks.

Quality management: setting standards to ensure high-quality project results.

Resource planning: Allocation of personnel, materials and other necessary resources.

Planning is an iterative process. Depending on the progress of the project, adjustments may be necessary to respond to new circumstances.

3. Implementation: The actual project work begins

Now the actual work on the project begins. In this phase, the planned tasks are carried out and the necessary resources are deployed to achieve the project goals.

Important aspects:

Team coordination: Project managers must ensure that all team members understand their tasks and work together efficiently.

Communication: Regular meetings, status reports and feedback loops help keep the project on track.

Change management: If unforeseen problems arise, adjustments must be made.

The success of the project depends largely on how well the implementation is organized and how flexibly the team reacts to challenges.

4. Monitoring and control: Continuous control of the project

Monitoring and control takes place in parallel with implementation. The goal is to continuously measure the progress of the project and ensure that it remains on schedule and within budget.

The focus of this phase is on

Progress monitoring: Are we on schedule? Are we achieving our goals?

Quality assurance: Do the results meet the defined standards?

Risk management: Have new risks emerged, and how can they be minimized?

Stakeholder management: Communication with key players to manage expectations.

This phase ensures that the project does not get out of hand and that problems can be addressed early on.

5. Closure: Bringing the project to a successful conclusion

The final stage of the project is the closing phase. The aim here is to officially end the project, document the results and carry out a review.

Important steps:

Evaluating the results: Have the objectives been achieved?

Final report: Documenting lessons learned for future projects.

Transferring the results to the customer or users.

A clean finish ensures better utilization of lessons learned and improves future projects.

What advantages and challenges does PMBOK bring?

PMBOK offers numerous advantages for companies, particularly through its comprehensive standardization. It ensures that project management processes are defined and understood in the same way worldwide. This standardization makes it easier for international teams to work together and promotes a common understanding of best practices.

Another key advantage is the collection of best practices. PMBOK is based on decades of experience in various industries and integrates methods that have proven successful in real-world projects. This allows companies to draw on proven approaches and increase their success rate.

Whether it's a small IT project or a complex construction project, PMBOK provides a flexible framework that can be applied to a wide range of projects. The PMBOK framework's scalability makes it possible to manage both small and large projects efficiently. Companies can adapt the methods and processes to the size and complexity of their respective project. PMBOK offers valuable guidance, especially for organizations with many projects running in parallel or complex stakeholder structures.

Advantages of PMBOK-based Project Management

Disadvantages of PMBOK-based Project Management

  • Consistent standards and terminology
  • Best practices and proven methods
  • Scalability for projects of different sizes
  • Highly complex methodology
  • Extensive documentation required
  • Limited adaptability to dynamic projects

Despite the numerous advantages, PMBOK also presents challenges. The comprehensive nature of the framework can lead to considerable complexity. Companies need to invest time and resources to familiarize themselves with the numerous processes, knowledge areas and best practices. The principle-oriented approach, which is given more emphasis in the seventh edition, is intended to counteract this process fixation, but the understanding and concrete applicability of principles and performance domains initially adds to the complexity. Especially for smaller companies or less experienced project teams, implementing the PMBOK guidelines can initially seem overwhelming.

Another critical issue is the high level of documentation required. PMBOK places a great deal of emphasis on structured and traceable project documentation. While this supports quality assurance and creates transparency, it also results in additional bureaucratic work.

The adaptability of PMBOK is also often discussed. While the framework generally allows for flexible adjustments, implementing them in practice is often difficult. Companies must ensure that they adapt the PMBOK processes to their individual needs without losing sight of the core principles. In the future, principles and service domains will help to gradually replace the rigid process-based model.

When is project management according to PMBOK the right choice?

PMBOK is particularly suitable for companies that rely on a standardized approach to project management and value structured planning and documentation.

It is the right choice if:

Projects are highly complex and require a clear structure.

Companies operate in regulated industries where detailed documentation is essential (e.g. pharmaceuticals, aviation, finance).

organizations work internationally and require a unified project management language.

Scalability and long-term optimization of processes play a central role.

Companies that have committed to agile methods or prefer fast, iterative processes should consider combining PMBOK with other methods to create a hybrid approach.

How does PMBOK differ from other project management process models?

PMBOK Guide vs. classic waterfall methods

PMBOK and classic waterfall methods share many similarities, but differ in their level of detail and application. Both rely on a sequential approach with clearly defined phases, but PMBOK offers a more comprehensive collection of processes and best practices.

Similarities between PMBOK and waterfall methods

Linear structure: Both PMBOK and classic waterfall methods are based on a sequential series of phases that build on each other. Changes during implementation are often difficult to implement.

Detailed planning: Both approaches rely on a thorough planning phase with comprehensive specifications before the actual implementation begins.

Documentation-driven: Documentation is highly important – both PMBOK and waterfall methods place a great deal of emphasis on requirements, plans, reports and evidence.

Differences between PMBOK and waterfall methods

 

PMBOK

Waterfall

FlexibilityProvides processes for adaptation and optimizationRigid process, changes are difficult to implement
FocusMethodical framework with best practicesFixed phases (requirements analysis → design → implementation → test → maintenance)
ScopeUniversal for different industriesOften in software development and engineering

While waterfall methods are suitable for clearly defined projects with stable requirements, PMBOK offers a more adaptable structure that allows for broader application.

PMBOK vs. PRINCE2: Differences in structure and application

PMBOK and PRINCE2® are among the best-known project management methods, but they differ in their structure and application. While PMBOK takes a process-based approach and describes best practices for project management processes, PRINCE2 is a methodical approach with clearly defined roles, processes and documents.

PRINCE2 places a strong focus on controlling the entire project life cycle and provides a stringent structure for decision-making processes. PMBOK, on the other hand, is more flexible and allows companies freedom in implementing the recommended practices. Companies with clear hierarchies and highly regulated projects often tend to favor PRINCE2, while PMBOK is better suited for organizations with individual process requirements.

 

PMBOK

PRINCE2

ApproachCollection of best practices and processesPredefined framework with defined roles
FlexibilityHigh, as there is no rigid methodologyMore rigid structure, less flexible
FocusProcesses, inputs, outputs, toolsGovernance, responsibilities and business case
Area of applicationUniversal for all industriesFrequently used in the UK and by public authorities

PRINCE2 project management method: principles, strengths and weaknesses

As standardized approaches, project management methods provide guidance for the planning, execution and controlling of projects. PRINCE2 is a process-oriented method that can be scaled and puts the benefits of a project at the center of project management. Our technical article offers an introduction to the basic idea, strengths and weaknesses of the PRINCE2 method.

 

Find out more about PRINCE2

PMBOK vs. IPMA: Kompetenzbasierte vs. prozessbasierte Ansätze

A fundamental difference between PMBOK and the IPMA® (International Project Management Association) lies in the methodological approach. PMBOK focuses on processes and best practices, while the IPMA's Individual Competence Baseline (ICB) model takes a competency-based approach.

The IPMA ICB not only considers processes, but also the individual abilities and soft skills of project managers. The method places particular emphasis on leadership, strategic thinking and social skills. Companies that want to develop their employees in project management in the long term often benefit from IPMA certification. PMBOK, on the other hand, is more suitable for organizations that want to establish process-oriented structures.

 

PMBOK

IPMA

FocusProcesses and MethodsPersonal and organizational skills
CertificationPMP (process-based)IPMA Level A–D (competency-based)
FlexibilityStructured Best PracticesAdaptation to the individual strengths of the project managers

PMBOK vs. Agile Methoden (Scrum, SAFe, Kanban): Planbarkeit vs. Flexibilität

While PMBOK takes a planning-oriented approach, agile methods such as Scrum, SAFe and Kanban rely on flexibility and iterative development. The biggest difference is that PMBOK prescribes a detailed project structure with defined phases, while agile methods rely on continuous adaptation and incremental development.

Scrum is particularly suitable for software development teams that work in short sprints. SAFe enables the scaling of agile principles in large companies. Kanban, on the other hand, optimizes workflows and minimizes bottlenecks by visually displaying tasks.

Companies that require a high degree of planning or are subject to regulatory requirements benefit from PMBOK. Agile methods, on the other hand, are ideal for dynamic environments where rapid adjustments are required.


 

PMBOK 

Agile

FocusStructured planningIterative development
FlexibilityRelatively lowHigh
DocumentationDetailed documentation requiredMinimal documentation
Area of applicationLarge, complex projectsDynamic, fast-changing projects

Scrum in software development: agile and structured

When it comes to agile software development methods, there is one term you can't avoid: Scrum. But what exactly is Scrum and how does it develop its strengths in software development? What roles and activities are there in Scrum? What are the advantages and disadvantages of this agile framework? You will learn all of this in this article. In addition, we will provide you with an insight into our agile Scrum variant, which we successfully use to develop Projektron BCS. We use BCS as Scrum software for this.

More about Scrum in software development and at Projektron

When is which process model the best choice?

Selecting the right project management approach depends on the individual requirements of a company. The following overview provides some guidance:

Process model

Advantages

Suitable for

PMBOKStructured processes, scalabilityintensive regulation industries, large companies
PRINCE2Clear distribution of roles, strict controlauthorities, companies with fixed project structures
IPMA (ICB)Focus on personal skillscompanies with long-term personnel development
ScrumRapid iterations, highly adaptablesoftware development, innovative industries
SAFeScaling of agile methodssoftware development, innovative industries
KanbanIncreased efficiency, visual transparencycompanies with variable workloads

In practice, many companies rely on hybrid approaches. A combination of PMBOK and agile methods, for example, can help to combine structured planning with flexibility. It is crucial that the process model fits with the corporate culture, the project requirements and the long-term goals.

Hybrid project management: combining traditional and agile methods for greater effectiveness and efficiency

Classic or agile? If you find it difficult to decide between these two approaches, a combination of classic and agile project management methods is probably the right way forward. Hybrid project management is the approach that seeks to combine the best of both worlds. In this article, you will learn how the hybrid approach works, when it is suitable, what advantages and disadvantages the approach has for organizations, and how you too can benefit from hybrid project management.

More about hybrid project management

Hybrid approaches: the combination of PMBOK and agile frameworks

Agile methods such as Scrum seem to contradict the detailed process structure of PMBOK. However, agile principles can be successfully integrated into the PMBOK framework to benefit from the advantages of both approaches.

Iterative planning: PMBOK allows iterative planning approaches within individual process groups. Teams can, for example, work in short cycles (sprints) while still using the overarching PMBOK processes.

Flexibility in execution: While PMBOK provides a structured framework, agile methods can help to react quickly to changing requirements.

Role customization: Classic project roles from PMBOK (project manager) can be combined with agile roles (scrum master, product owner).

Combining PMBOK and agile methods can be useful if a company needs structured processes but also wants to benefit from the advantages of agile flexibility.

When are hybrid approaches useful?

In large organizations: While management often relies on structured processes and reporting, teams benefit from agile methods in implementation.

In regulated industries: PMBOK provides the necessary framework for compliance and documentation, while agile methods enable innovation and rapid adjustments.

For complex projects with uncertain requirements: A combination of detailed planning and agile flexibility makes it easier to deal with uncertainties.

Typical hybrid models

Agile development within a PMBOK project management: The overall project is managed according to PMBOK, but individual sub-projects or teams work in an agile manner.

Agile methods with PMBOK-controlled governance: Management uses PMBOK for controlling and reporting, while teams use agile frameworks.

Phase-based approach (“waterfall agile”): The planning phase follows PMBOK, while the implementation is agile.

Possible agile additions to the PMBOK structure

PMBOK process group

Possible agile additions

1. Initiating

Produktvisionierung, Stakeholder-Mapping

2. Planning

Release Planning, Roadmaps, User Stories

3. Execution

Scrum, Kanban, Daily Stand-ups

4. Control

Sprint Reviews, Burndown Charts

5. Closure

Retrospektives, Lessons Learned

PMI certifications and learning paths for PMBOK

A PMP certification is considered a seal of quality for professional project managers and significantly increases career opportunities. PMI offers various certifications for different levels of experience and specializations in project management:

Project Management Professional (PMP)®: The most well-known certification for experienced project managers with extensive knowledge of PMBOK.

Certified Associate in Project Management (CAPM)®: entry-level certification for junior project managers and career changers.

PMI Agile Certified Practitioner (PMI-ACP)®: For project managers who use agile methods such as Scrum, Extreme Programming, Lean Management, Kanban.

Program Management Professional (PgMP)®: Specifically for managing multiple projects within a program.

Further certifications such as PMI-RMP (risk management) or PfMP (portfolio management) offer specializations for specific roles.

All certificates must be recertified after three years.

PMBOK can be learned through training, online courses, specialist literature, practical application and exchange in specialist groups. Official training and flexible e-learning options impart theoretical knowledge, while practical projects and networks deepen its application.

Which software for PMBOK project management?

Sound project management according to PMBOK requires powerful software that maps all relevant processes and at the same time flexibly addresses company requirements. Projektron BCS offers a comprehensive solution for this: from structured planning to risk management to the optional integration of agile methods.

Projektron BCS supports all ten knowledge areas and five process groups of the PMBOK framework and offers useful tools for all eight performance domains in project management. Project managers can define work packages in detail, create schedules and control dependencies. In addition, the software enables standardized documentation that creates transparency and facilitates collaboration.

A central component of PMBOK is risk management. In Projektron BCS, risks can be systematically recorded, evaluated and assigned to measures. Integrated resource planning helps teams keep track of capacities and availabilities. Detailed reports and dashboards provide real-time information on progress, budgets and bottlenecks – essential for data-based decisions.

Numerous companies successfully use Projektron BCS for their project management according to PMBOK. Projektron BCS makes it easier to standardize processes while also offering customization options.

On our method page for BCS for project management according to PMBOK, you will find detailed information and practical examples. Would you like to see the software in action? Arrange a free online presentation to see for yourself the advantages for your company.

See for yourself and start your Projektron BCS test.

Test Projektron BCS for free

 

Natalia Sergeeva, Senior IT Consultant Planning & Governance, Panasonic Europe B.V.

“We are certified according to ISO 27001 (information security), ISO 27017 (cloud security) and carry out projects according to the PMI framework. Projektron BCS seemed very flexible and adaptable at first glance. We were also convinced by the costs: Projektron BCS is much cheaper to run than our previous solution. The decision in favor of BCS was therefore quickly made and, for us, switching to Projektron BCS meant, above all, greater flexibility and an extended range of functions.”

Read the Panasonic success story

What does the future hold for PMI and PMBOK?

PMBOK provides a proven framework for professional project management that enables standardization, best practices and scalability. At the same time, its application requires precise adaptation to the specific needs of a company, particularly with regard to complexity and documentation. With the seventh edition, PMI's PMBOK Guide has evolved significantly.

While previous versions were strongly process-oriented, the current edition focuses on principles and outcome-oriented thinking. Instead of a fixed process framework, PMI now relies on a flexible, customizable methodology that is better suited to dynamic and complex projects. This development reflects the increasing importance of agile, hybrid and customized approaches in modern project management, which will become even more important in future editions.

In the future, PMI will continue to adapt the PMBOK Guide to the changing requirements of the working world. Topics such as artificial intelligence, automation and data-driven management are playing an increasingly important role. Companies benefit from tools that support both classic and agile methods while integrating modern technologies.

Projectron BCS offers companies the flexibility they need to efficiently manage PMBOK-compliant projects. The software combines powerful resource management, reporting, and process automation features with the ability to use agile methods such as Scrum and Kanban. This not only allows companies to implement the PMBOK Guide, but also to adapt it to their specific requirements.

About the author

Kai Sulkowski is an editor in the marketing department at Projektron and an expert in project management topics. With his many years of experience in analyzing and processing complex technical content, he imparts in-depth knowledge of best practices, methods and trends in project management. His focus is on providing practical content that helps companies manage their projects efficiently.

More interesting articles on the Projektron blog

Symbolic image for the connection between PMI and PMBOK: the organization and its guide fit together like two puzzle pieces and together form the foundation for professional project management.

Symbolic image for the connection between PMI and PMBOK: the organization and its guide fit together like two puzzle pieces and together form the foundation for professional project management.

All references To top